Reliability Standards Regulation (Man. Reg. 25/2012).

The present Regulation is made under the Manitoba Hydro Act. In particular, the Regulation lays down provisions relating to reliability standards. Section 2 establishes that a reliability standard made by the Midwest Reliability Organization (MRO) is listed in Schedule 1 is adopted as a reliability standard for Manitoba, and takes effect on the date listed opposite the standard. The text consists of 12 sections and 2 Schedules. Schedule 2 by the North American Electric Reliability Corporation establishes the Compliance Monitoring and Enforcement Programme.

كندا · 2012-01-01