Steps in the Rate classes
environmental __________________________________________________
impact assessment
and review procedure 1 2 3 4
___________________________________________________________________________________
1. Filing of the project $1,106 $1,106 $1,106 $1,106
notice under
section 31.2 of the Act
___________________________________________________________________________________
2. Filing of the impact $4,423 $15,483 $26,544 $37,605
statement under the
first paragraph of
section 31.3 of the Act
___________________________________________________________________________________
3. Beginning $0 $38,711 $66,361 $94,012
of the public
consultation under
the third paragraph
of section 31.3 of
the Act
___________________________________________________________________________________
Total $5,529 $55,300 $94,011 $132,723
___________________________________________________________________________________
___________________________________________________________________________________
Classes of projects Subclasses of projects for Rate classes
for the application the application of the fee ________________________
of the fee schedule schedule
1 2 3 4
___________________________________________________________________________________
PROJECTS DESCRIBED IN THE
FIRST PARAGRAPH OF
SECTION 2 OF THE
REGULATION RESPECTING
ENVIRONMENTAL IMPACT
ASSESSMENT AND REVIEW
___________________________________________________________________________________
Paragraph (a)
- construction and √
subsequent operation
of a dam or dike [...]
___________________________________________________________________________________
Paragraph (b)
- program or project √
involving the dredging,
digging, filling,
levelling off or
backfilling [...]
___________________________________________________________________________________
Paragraph (c) Subclasses:
- rerouting or 1. within the same √
diverting of a river watershed - flow diverted
to the river
2. towards another watershed √
- flow not diverted to the river
___________________________________________________________________________________
Paragraph (d) Subclasses:
- construction of a port 1. construction of a port or √
or wharf wharf intended for 100 or
more pleasure or fishing craft
- extension of a port or 2. construction of any other √
wharf or modification in port or wharf
the use of a port or
wharf [...]
___________________________________________________________________________________
Paragraph (e) Subclasses:
- construction, 1. more than 1 km but less √
rebuilding or widening, than 2 km
along more than 1 km,
of a road or other 2. 2 km but less than 5 km √
public road network
designed for 4 or more
lanes of traffic [...]
3. 5 km or more √
___________________________________________________________________________________
Paragraph (f)
- construction, √
rebuilding or widening,
along more than 2 km,
of any road or other
road network intended
for forestry, mining
or energy operations
[...]
___________________________________________________________________________________
Paragraph (h)
- establishment of a √
marshalling yard or
railway station and
construction of more
than 2 km of railway
[...]
___________________________________________________________________________________
Paragraph (i)
- establishment or √
extension of an
airport [...]
___________________________________________________________________________________
Paragraph (j)
First paragraph
- construction of √
installations for
natural gas gasification
or liquefaction and
construction of more
than 2 km of oil
pipeline in a new
right-of-way [...]
Second paragraph
- construction of a gas √
pipeline more than
2 km in length
___________________________________________________________________________________
Paragraph (k) Subclasses:
- construction or 1. more than 2 km but less √
relocation of an than 5 km
electric power
transmission line of
315 kV or more over
a distance of more than
2 km 2. 5 km or more √
- construction or √
relocation of a control
or transformer station
of 315 kV or more
___________________________________________________________________________________
Paragraph (l) Subclasses:
First paragraph
- construction, √
reconstruction and
subsequent operation
of a hydroelectric
generating station
or fossil fuel-fired
generating station
with a capacity that
exceeds 5 MW
- construction, 1. 10 MW but less than √
reconstruction and 50 MW
subsequent operation of
any other electric power
generating station with
a capacity that exceeds
10 MW, except a nuclear 2. 50 MW or more √
generating station
contemplated by
subparagraph m
Second paragraph
- subject to the √
provisions of the second
paragraph of section 2,
any increase in the
capacity of a
hydroelectric generating
station [...]
Third paragraph
- addition of a √
turboalternator to a
boiler that had not been
previously used to
produce electric
power [...]
___________________________________________________________________________________
Paragraph (m)
- construction or √
extension of a nuclear
fission or fusion
establishment, of a
plant that manufactures,
processes or reprocesses
nuclear fuel, or of a
disposal or storage site
for radioactive waste
___________________________________________________________________________________
Paragraph (n)
- construction of an √
oil refinery, of a
petrochemical plant, or
of a liquid petroleum
gas fractionating plant
- construction of a plant √
that processes or
synthesizes energy-
producing gas, or of a
plant that processes or
synthesizes coal products
___________________________________________________________________________________
Paragraph (n.1) Subclasses:
- construction of a mill 1. de-inking plant √
within the meaning of the
Regulation respecting
pulp and paper mills
[...] 2. other pulp and paper mills √
___________________________________________________________________________________
Paragraph (n.2)
- construction of a √
dismembering plant
___________________________________________________________________________________
Paragraph (n.3)
- construction of a √
mill that produces
metals, metal alloys
or metalloids [...]
___________________________________________________________________________________
Paragraph (n.4)
- construction of a √
cement plant
- construction of a √
slaked lime plant
___________________________________________________________________________________
Paragraph (n.5)
- construction of an √
explosives plant
___________________________________________________________________________________
Paragraph (n.6)
- construction of a √
chemical plant [...]
___________________________________________________________________________________
Paragraph (n.7)
- construction of a √
heavy water plant
___________________________________________________________________________________
Paragraph (n.8)
- construction of an
ore processing
plant for
- metalliferous ore or √
asbestos ore, where the
processing capacity of the
plant is 7,000 metric tons
or more per day
- uranium ore √
- any other ore, where √
the processing capacity
of the plant is 500 metric
tons or more per day
___________________________________________________________________________________
Paragraph (n.9)
- construction of a metal √
products processing
plant [...]
___________________________________________________________________________________
Paragraph (n.10)
- construction of a mill √
that produces chipboard
from wood fibre [...]
___________________________________________________________________________________
Paragraph (n.11)
- construction of a plant √
that manufactures vehicles
or aircraft, including
parts for such vehicles
[...]
___________________________________________________________________________________
Paragraph (o)
- construction or √
extension of 1 or
more buildings in a
livestock operation [...]
___________________________________________________________________________________
Paragraph (p)
- opening and operation
of
- a metals mine or an √
asbestos mine that has
a production capacity of
7,000 metric tons or more
per day
- a uranium mine √
- any other mine that √
has a production
capacity of 500 metric
tons or more per day
___________________________________________________________________________________
Paragraph (q)
- program or project √
for aerial
pesticide spraying
for non-agricultural
purposes over an area
of 600 ha or more
[...]
___________________________________________________________________________________
Paragraph (r)
- construction of an √
incineration facility
governed by Chapter
III of the Regulation
respecting the
landfilling and
incineration of residual
materials (chapter Q-2, r. 19),
with a capacity
of 2 metric tons or more
per hour, an increase in
the incinerating capacity
of such a facility or an
alteration to an
incineration facility
increasing its capacity
to 2 metric tons or more
per hour
___________________________________________________________________________________
Paragraph (r.1)
- construction of an √
incinerator wholly
or partly intended for
biomedical waste
within the meaning of
section 1 of the
Regulation respecting
biomedical waste
(chapter Q-2, r. 12)
or any alteration aimed
at increasing by more
than 10% the
incinerating capacity
of such an incinerator
___________________________________________________________________________________
Paragraph (s)
- establishment of 1 √
or more reservoirs
with a total storage
capacity of over 10,000
kilolitres intended to
hold a liquid or gaseous
substance [...]
___________________________________________________________________________________
Paragraph (t)
- installation or use of √
facilities used in whole
or in part for the
incineration of residual
hazardous materials [...]
___________________________________________________________________________________
Paragraph (u)
- installation or use of √
facilities used in whole
or in part for energy
generation or pyrolysis
of residual hazardous
materials [...]
___________________________________________________________________________________
Paragraph (u.1)
- establishment or √
extension of an
engineered landfill
referred to in Division 2
of Chapter II of the
Regulation respecting
the landfilling and
incineration of residual
materials (chapter Q-2, r. 19)
used in whole or
in part for the final
deposit of household
garbage collected by or
for a municipality [...]
- establishment or √
extension of a
construction or demolition
waste landfill referred to
in the second paragraph of
section 102 of the
Regulation respecting
the landfilling and
incineration of residual
materials [...]
___________________________________________________________________________________
Paragraph (v)
- establishment or √
extension of a site
used in whole or in
part for the final
deposit of hazardous
materials [...]
___________________________________________________________________________________
Paragraph (w)
- installation or use √
of facilities used in
whole or in part for
the treatment of
residual hazardous
materials outside
their production
location [...]
___________________________________________________________________________________
Paragraph (x)
- establishment or √
extension of a site
used in whole or in
part for the final
deposit of soils
[...]
___________________________________________________________________________________
Paragraph (y)
- installation or use √
of facilities used in
whole or in part for
the heat treatment
of soils [...]
___________________________________________________________________________________