This Order, consisting of 6 articles, regulates article 3 of Resolution CONAMA No. 462/2014 and establishing criteria, requirements and previous studies for environmental licensing of wind power generation projects within the state of Rio Grande do Sul. It regulates all necessary requirements for wind power generation, such as: the size and location of these infrastructures, EIA/RIMA and RAS as the two types of previous studies, which will support the environmental licensing processes for wind power generation projects and infrastructures.
Brazil · 2014-12-01