Development plan for the Northern Sea Route for the period until 2035 envisages implementation of liquefied natural gas production projects, determination of a single maritime logistics operator for the implementation of measures for the delivery of socially significant cargo to populated areas of territories adjacent to the waters of the Northern Sea Route; conducting geological exploration to prepare the mineral material base of potential projects that form the cargo base of the Northern Sea Route; monitoring the fulfillment of license obligations of licenses for the use of subsoil in terms of fields in the Arctic zone, the resource base of which could potentially ensure the loading of the Northern Sea Route; development of a comprehensive plan for the creation in the Republic of Sakha (Yakutia) of the Kyuchus cluster of solid mineral deposits using electricity from a low-power nuclear power plant; providing interested customers, with distant zoning of the Earth data received from optical-electronic and radar observation spacecraft; modernization of the ground-based hydrometeorological observation network in the Arctic zone of the Russian Federation based on existing polar stations; and analysis of environmental risks and preparation of proposals for their reduction in the waters of the Northern Sea Route, including the prevention and elimination of environmental pollution, as well as in the adjacent territories where projects are being implemented aimed at developing cargo flow along the Northern Sea Route.
Russian Federation · 2022-08-01