The Rules govern the establishment, supervision, monitoring and transfer of the Multi-Species Marine Hatchery (MSMH) of Del Carmen. They define relevant terms and establish requirements for construction, operation and management of the hatchery. Construction shall be supervised by the Department of Agriculture-Bureau of Fisheries and Aquatic Resources (DA-BFAR) Regional Fisheries Office XIII and shall follow an approved feasibility study and detailed engineering design. DA-BFAR shall fund and lead the initial operation of the hatchery and provide training to local technical personnel. Within two years after construction and commissioning, operation and management of the facility shall be transferred to the Local Government Unit of Del Carmen through a Memorandum of Agreement. The LGU shall establish the required staffing structure and allocate funds for the management and operation of the hatchery, including a trust fund for hatchery proceeds. The Rules also establish a Monitoring Committee responsible for periodic assessment, consultation with the LGU, and submission of reports and recommendations. Following the transfer, DA-BFAR shall continue to provide technical assistance to the LGU. The Rules further provide for implementing circulars.
Philippines · 2026-01-05