Ecological Control Station Authorization Ordinance.

The present Ordinance implements the Ecological Production Act (BGBl. No. BGBl. I p. 2358). In particular, the Ordinance lays down provisions relating to the authorization and functioning of private control boards. The text, consisting of 17 Articles, deals with the following aspects: sphere of application, application for authorization, content of application, quality management, standard control procedures, model control contract, analysis of risk, sampling, duty to report, requirements of personnel in control stations, catalog of measures, requirements for the control center staff, transitional provisions and entry into force. Four Annexes are enclosed.

Alemania · 2012-05-07