The present Regulation contains at the outset a definition clause relating to various terms employed therein, such as “actual construction”, “actual cost”, “applicant”, “court”, “final construction plans”, “final licence”, “general construction plans”, “survey permit”, “work”, “power development”, etc. Section 3 establishes that every applicant for a licence to divert, use or store water for power purposes shall file with the director a statement giving or accompanied by the information listed in this section. The text consists of 90 sections.
Канада · 1988-01-15