These Regulations have been established pursuant to the Water Pollution Control Act. Chapter II provides for the management of runoff wastewater. The wastewater or sewage produced by enterprises or sewage systems shall be collected through ditches, pipes, or containers within the work environment, and shall not be mixed and collected with rainwater. Chapter III makes provisions for wastewater or sewage treatment/pre-treatment facilities. Enterprises or sewage systems shall take measures to reduce the sludge produced from the wastewater or sewage treatment/pre-treatment facilities. Chapter IV provides for discharge of sewage into sewage systems. Enterprises in the sewage system area that do not discharge produced wastewater or sewage into the sewage system shall not discharge it into any surface water body without the consent of the sewage management authority and acquisition of the surface water body discharge permit or a simple discharge permit document. Chapter V deals with soil treatment. Wastewater or sewage from the sewerage of industrial wastewater or sewage shall be subject to pretreatment in conformity to the standard for soil treatment before proceeding to soil treatment. Enterprises or sewage systems shall set up containment facilities at the lower slope in the section of land used for soil treatment to collect and treat wastewater or sewage overflow appropriately.
китайская провинция Тайвань · 2006-04-16