This Regulation determines the following: plants and facilities (installations) for which the Federal Ministry of Physical Planning and Environment must elaborate a official procedure of environmental impact assessment in the process of issuing of necessary environmental permits; plants and facilities for which the Federal Ministry has to decide the conditions for obtaining of the environmental permits; plants and facilities that are not under the mandatory environmental impact assessment evaluation process, but still aimed to obtain a official construction and/or operational permit issued by the competent Ministry; plants and facilities with a concrete and high risk of major accidents; the study of the environmental impact on the national territory; the necessary criteria for determining the needs of a concrete implementation of environmental impact assessment. This Regulation includes also all activities planned in the area, which do not belong to the plants and facilities mentioned above, but still representing a significant environmental impact threat on the territory of the Federation BIH.
波斯尼亚和黑塞哥维那 · 2004-01-01