Measures for Supervision and Administration on Electric Power Supply.

The purpose of these Measures is to strengthen supervision and administration on electric power supply. The Measures consist of 40 Articles divided into 5 Chapters: General Provisions (I); Content of Supervision and Administration (II); Measures for Supervision and Administration (III); Penalties(IV); Supplementary Provisions (V).

中国 · 2009-11-20